Old 05-12-2017, 10:34 AM   #1
Senior Member
 
Join Date: Oct 2013
Location: MN
Posts: 1,035
Rewards Points: 618
Thanks: 564
Thanked 851 Times in 409 Posts
View Stretch67's Photo Album My Photos
Default Ethanol Plant

Anyone done one new construction care to share any insights? Bidding one, looks to be 3-4M for painting. Maybe 200M overall. What to expect?

Sent from my SM-G930T using Tapatalk
__________________
I got a post hole digger too! What's that got to do with the weather?
Stretch67 is offline   Reply With Quote
Sponsored Links
Advertisement
 
Old 05-12-2017, 07:11 PM   #2
Member
 
kentdalimp's Avatar
 
Join Date: Aug 2013
Location: Anaheim CA
Posts: 41
Rewards Points: 64
Thanks: 13
Thanked 16 Times in 10 Posts
View kentdalimp's Photo Album My Photos
Default

Nothing out of the ordinary. Biggest thing will be to go through the Spec with a Fine tooth comb and look for any issues.

Big Commercial/Industrial Jobs you will Live or Die by the Specification. Not knowing what your experience is (Maybe you do big jobs all the time?) You need to get very familiar with all the ins and outs. Are you familiar with the materials to be used? Will there be inspectors? Will there be testing?

I'll give what advice I can, How familiar are you with large scale jobs like this?
kentdalimp is offline   Reply With Quote
Old 05-12-2017, 07:15 PM   #3
Senior Member
 
Join Date: Oct 2013
Location: MN
Posts: 1,035
Rewards Points: 618
Thanks: 564
Thanked 851 Times in 409 Posts
View Stretch67's Photo Album My Photos
Default

Quote:
Originally Posted by kentdalimp View Post
Nothing out of the ordinary. Biggest thing will be to go through the Spec with a Fine tooth comb and look for any issues.

Big Commercial/Industrial Jobs you will Live or Die by the Specification. Not knowing what your experience is (Maybe you do big jobs all the time?) You need to get very familiar with all the ins and outs. Are you familiar with the materials to be used? Will there be inspectors? Will there be testing?

I'll give what advice I can, How familiar are you with large scale jobs like this?
Very familiar with this scale of job. Just found out no inspectors and no third party engineering. If it looks good, it passes. 1 year warranty.

We're very experienced with high performance coatings including PC coatings such as polyurea. Piping looks to be a couple coats of DTM and not sure on tanks yet. Probably the same judging by what I've seen doing maintenance work. I could try sell them on epoxy/urethane but doubtful. Painting is such a small part of the overall picture, it's hard to convince them it's worth the good stuff.

I have done a ton of maintenance work in these plants. Now I know why the original paint job sucks so bad. Sounds like spray and pray from.

Have you had any luck prefinishing the pipe and then just touch up the joints once installed? Or do they scar it up so bad it needs a full coat anyway?

Sent from my SM-G930T using Tapatalk
__________________
I got a post hole digger too! What's that got to do with the weather?

Last edited by Stretch67; 05-12-2017 at 07:18 PM..
Stretch67 is offline   Reply With Quote
 
Old 05-12-2017, 07:39 PM   #4
Senior Member
 
painter213's Avatar
 
Join Date: Nov 2008
Location: Birmingham, Al.
Posts: 219
Rewards Points: 150
Thanks: 21
Thanked 98 Times in 52 Posts
View painter213's Photo Album My Photos
Default

Quote:
Originally Posted by Stretch67 View Post
Anyone done one new construction care to share any insights? Bidding one, looks to be 3-4M for painting. Maybe 200M overall. What to expect?

Sent from my SM-G930T using Tapatalk


Specs, hold points, QC, tight numbers, etc. do you have a specification yet? What kind of painting is it?


Sent from my iPhone using Tapatalk
__________________
NACE Certified Coatings Inspector Level III #7953,
SSPC Protective Coatings Specialist #2014-529-139
E-Mail: babbott@abbottcoatinginspections.com
Phone: (205-717-0292)
painter213 is offline   Reply With Quote
Old 05-12-2017, 07:42 PM   #5
A Brush Above
 
Paradigmzz's Avatar
 
Join Date: May 2010
Location: College Station, TX
Posts: 4,654
Rewards Points: 2,584
Thanks: 4,676
Thanked 3,570 Times in 1,859 Posts
View Paradigmzz's Photo Album My Photos
Default

You will be do a whole lot more painting than just striping if you are using just DTM. Yall responsible for blasting? Id assume you would be responsible so you can control getting zinc coats on- on your time table.
__________________
Quote:
Originally Posted by Schmidt & Co. View Post
Still waiting to see if this "internet thing" is going to take off......
Quote:
Originally Posted by aaron61 View Post
I wouldn't worry about it.This internet thing aint gonna last
Paradigmzz is offline   Reply With Quote
Old 05-12-2017, 07:44 PM   #6
Member
 
kentdalimp's Avatar
 
Join Date: Aug 2013
Location: Anaheim CA
Posts: 41
Rewards Points: 64
Thanks: 13
Thanked 16 Times in 10 Posts
View kentdalimp's Photo Album My Photos
Default

Does the Pipe come Shop Primed? Hop on the GC right now to be the guy to spec the materials for priming (Always bothers me that the Steel guys can control the materials when they have like <5% of the total painting package to do)

Typically we would want to do the first coat in the shop and the final finish coat after install. We have space to do the work in house though. That way it reduces Field extras for finished work being damaged during install. (Not always possible though)

Key words: "Delivery of piping to [our facility] and subsequent pickup and delivery to [jobsite] to be performed by others."

What is specified? Amerlock 2? *(Just re-read your Prievious reply and realize this is a dumb question! - Also I cant spell previous!!)
Stretch67 likes this.

Last edited by kentdalimp; 05-12-2017 at 07:47 PM..
kentdalimp is offline   Reply With Quote
Old 05-12-2017, 07:48 PM   #7
Senior Member
 
Join Date: Oct 2013
Location: MN
Posts: 1,035
Rewards Points: 618
Thanks: 564
Thanked 851 Times in 409 Posts
View Stretch67's Photo Album My Photos
Default

Quote:
Originally Posted by Paradigmzz View Post
You will be do a whole lot more painting than just striping if you are using just DTM. Yall responsible for blasting? Id assume you would be responsible so you can control getting zinc coats on- on your time table.
Yeah we do the blasting. We have the stuff.

But for some reason I don't even think they use zinc. Just getting takeoffs etc put together... takes time.

What do you mean DTM takes more painting? I talked to some of the field guys and a couple supts to get a feel for the "field conditions". They said on the piping u just pull out the roller and go. Maybe wire brush here and there but not much. At joints mostly.

I believe em too. I've done maintenance work on plants 10 years old and 90% of the paint is already fell off. I don't really care if they want quality or speed I can do either. They're looking more for speed (price).

The tanks are blast and paint. No cleanup to speak of.

Sent from my SM-G930T using Tapatalk
__________________
I got a post hole digger too! What's that got to do with the weather?
Stretch67 is offline   Reply With Quote
Old 05-12-2017, 07:54 PM   #8
Senior Member
 
Join Date: Oct 2013
Location: MN
Posts: 1,035
Rewards Points: 618
Thanks: 564
Thanked 851 Times in 409 Posts
View Stretch67's Photo Album My Photos
Default

Quote:
Originally Posted by painter213 View Post
Specs, hold points, QC, tight numbers, etc. do you have a specification yet? What kind of painting is it?


Sent from my iPhone using Tapatalk
I understand those ideas and processes. But they're more common in public work such as water towers, dams etc.

This is private work.

As in Mr. Koch calls my GC and says "I need a new plant asap get it done!"

GC calls us and says "We got half the concrete in the ground lmk what it's gonna take to paint the place, all the mild steel."

Then comes over a bazillion drawings to figure out the price. Drawings in which paint is basically the last thing on anyone's mind.

Sent from my SM-G930T using Tapatalk
__________________
I got a post hole digger too! What's that got to do with the weather?
Stretch67 is offline   Reply With Quote
Old 05-12-2017, 07:55 PM   #9
Member
 
kentdalimp's Avatar
 
Join Date: Aug 2013
Location: Anaheim CA
Posts: 41
Rewards Points: 64
Thanks: 13
Thanked 16 Times in 10 Posts
View kentdalimp's Photo Album My Photos
Default

Quote:
Originally Posted by Stretch67 View Post
They said on the piping u just pull out the roller and go. Maybe wire brush here and there but not much. At joints mostly.
How many coats per spec? Is there a Stripe Coat Requirement?

Depends on the conditions, but 2/3 of the time we would probably brush and roll something like this if it's field applied. Easiest way to get the mil thickness.
Stretch67 likes this.
kentdalimp is offline   Reply With Quote
Old 05-12-2017, 07:58 PM   #10
Senior Member
 
painter213's Avatar
 
Join Date: Nov 2008
Location: Birmingham, Al.
Posts: 219
Rewards Points: 150
Thanks: 21
Thanked 98 Times in 52 Posts
View painter213's Photo Album My Photos
Default

I see it almost every day I public work. More and more is specifying jobs and requiring QC hold points. Not just for government work anymore. Even if it doesn't ask for it, I'd still document QC testing for accountability. That should be common practice. What polyurea products do you apply and how long have you been applying them?


Sent from my iPhone using Tapatalk
__________________
NACE Certified Coatings Inspector Level III #7953,
SSPC Protective Coatings Specialist #2014-529-139
E-Mail: babbott@abbottcoatinginspections.com
Phone: (205-717-0292)
painter213 is offline   Reply With Quote
The Following User Says Thank You to painter213 For This Useful Post:
CApainter (05-12-2017)
Old 05-12-2017, 08:01 PM   #11
Senior Member
 
CApainter's Avatar
 
Join Date: Jun 2007
Location: San Francisco Bay Area, CA
Posts: 11,461
Rewards Points: 1,156
Thanks: 10,734
Thanked 9,185 Times in 5,097 Posts
View CApainter's Photo Album My Photos
Default

Are you on a preferred contractor listing with the owner? It seems a lot of industrial coating companies need SSPC QP1 and 2 to qualify and compete as a competent bidder. Particularly when it involves a utility or power company.

And as a company that applies 100% SBV Plural component coatings, like polyurea, can you share any problems you've experienced?

Thanks.
__________________
To avoid criticism, say nothing, do nothing, be nothing.-Aristotle (referenced from The PokerKid)

Last edited by CApainter; 05-12-2017 at 08:08 PM..
CApainter is offline   Reply With Quote
Old Yesterday, 10:13 AM   #12
Senior Member
 
PACman's Avatar
 
Join Date: Oct 2014
Location: North central Ohio
Posts: 7,457
Rewards Points: 1,836
Thanks: 2,992
Thanked 4,237 Times in 2,794 Posts
View PACman's Photo Album My Photos
Default

You know, now that you mention it......I actually OWN an ethanol plant! So to speak.
__________________
"One who dares not offend cannot be honest." Thomas Paine-patriot

"Screw you guys! I'm going home!" Cartmann
PACman is offline   Reply With Quote
Old Yesterday, 12:17 PM   #13
Senior Member
 
CApainter's Avatar
 
Join Date: Jun 2007
Location: San Francisco Bay Area, CA
Posts: 11,461
Rewards Points: 1,156
Thanks: 10,734
Thanked 9,185 Times in 5,097 Posts
View CApainter's Photo Album My Photos
Default

Quote:
Originally Posted by PACman View Post
You know, now that you mention it......I actually OWN an ethanol plant! So to speak.
More like an H2S plant. Pew!
__________________
To avoid criticism, say nothing, do nothing, be nothing.-Aristotle (referenced from The PokerKid)
CApainter is offline   Reply With Quote
Old Yesterday, 02:09 PM   #14
Senior Member
 
PACman's Avatar
 
Join Date: Oct 2014
Location: North central Ohio
Posts: 7,457
Rewards Points: 1,836
Thanks: 2,992
Thanked 4,237 Times in 2,794 Posts
View PACman's Photo Album My Photos
Default

Quote:
Originally Posted by CApainter View Post
More like an H2S plant. Pew!
I was talking about the still.......
CApainter likes this.
__________________
"One who dares not offend cannot be honest." Thomas Paine-patriot

"Screw you guys! I'm going home!" Cartmann
PACman is offline   Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Look inside California plant Stonehampaintdept General Painting Discussion 1 11-25-2016 09:58 AM
Corona brushes are made in America..Picasso's in china...is there any issue?.. fipple General Painting Discussion 37 11-23-2016 01:28 PM


All times are GMT -4. The time now is 04:57 AM.


Powered by vBulletin® Version 3.8.8
Copyright ©2000 - 2017, vBulletin Solutions, Inc.
Content Relevant URLs by vBSEO 3.6.1
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.