Default Estimate Help

Help please......I do new construction cabinetry and finishing. I have a client that wants me to match his interior trim to the cabinets. Most of the trim is installed and has one coat of primer and paint on it. His painter started this job but can't finish it. The cabinets I did for him are heavily distressed and have a wipe off glaze on them. This would require me sandwiching the glaze in between two waterborne clear coats over the paint. ( I think.......I have not tested the glaze directly on the paint yet.) Anyway, I am not quite sure how to price this job. The glaze is very labor intensive, you spray it on and then have to scrub with steel wool. This is approx a 4 to 5 million dollar home and every foot of trim needs to be distressed. I normaly quote finish for cabinetry, laquers, conversion varnishes, so I am kinda sumpped on what to charge him. I want to be fair with this client and cover my rump at the same time.
Thanks in advance for any help
cltaylor3174 is offline   Reply With Quote

Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. PaintTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Sponsored Links
Advertisement
 
Old 06-23-2009, 06:45 PM   #2
Senior Member
 
Join Date: May 2008
Posts: 1,812
Rewards Points: 1,000
Thanks: 23
Thanked 95 Times in 74 Posts
View TooledUp's Photo Album My Photos
Default

Only you know what the actual finish and procedure will be. Nobody can give you any figures apart from yourself. If you're not sure then why not take an hourly rate?
TooledUp is offline   Reply With Quote
Old 06-23-2009, 07:00 PM   #3
Save 2nd base!

 
ProWallGuy's Avatar
 
Join Date: Apr 2007
Location: St. Louis MO
Posts: 6,455
Rewards Points: 4,658
Thanks: 3,442
Thanked 4,393 Times in 1,919 Posts
View ProWallGuy's Photo Album My Photos
Default

If they live in a 4-5 million dollar pad, and want your work, hit them with a hefty T&M rate and do your thing.
__________________

To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.


To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.




ProWallGuy is offline   Reply With Quote
Sponsored Links
Advertisement
 
Old 06-23-2009, 07:17 PM   #4
 
Join Date: Jun 2009
Posts: 5
Rewards Points: 10
Thanks: 0
Thanked 0 Times in 0 Posts
View cltaylor3174's Photo Album My Photos
Default

My client is a builder NOT the homeowner...in fact there is no home owner yet. He gives me alot of cabinetry work so I don't want to kill him. I am thinking .50 to .75 per linear foot perapplication. I don't need to tape off and he is buying the material. Am I way off?
cltaylor3174 is offline   Reply With Quote
Old 06-23-2009, 07:21 PM   #5
Member
 
Join Date: May 2009
Location: Indiana
Posts: 69
Rewards Points: 75
Thanks: 2
Thanked 4 Times in 3 Posts
View paintguy48's Photo Album My Photos
Default

T&M no question. This is custom work, not blow and go. Or, do about 10 feet of test for color and time and work from that.

Good Luck Man
paintguy48 is offline   Reply With Quote
Old 06-23-2009, 08:53 PM   #6
 
Join Date: Jun 2009
Posts: 5
Rewards Points: 10
Thanks: 0
Thanked 0 Times in 0 Posts
View cltaylor3174's Photo Album My Photos
Default

Please forgive my ignorance but I have never had to quote a job T&M. I quote everything in a square or linear foot. (Mind you I also do all my work in my own shop) I pretty much have my material and overhead figured in my square foot price. I have done very little site work so I am a little hesitant to charge at an hourly rate for something that might take me twice as long as a professional house painter. Again I apprciate any suggestions,
Caren
cltaylor3174 is offline   Reply With Quote
Old 06-23-2009, 08:55 PM   #7
Senior Member
 
Slingah's Avatar
 
Join Date: Sep 2007
Location: Location, Location
Posts: 375
Rewards Points: 250
Thanks: 92
Thanked 70 Times in 51 Posts
View Slingah's Photo Album My Photos
Default

if he will not take T&M...see if you can do 1 room or area T&M to get a line on how long it will take to do....then go from there on giving a firm price...
no one is going to know your numbers(cost) but you.
Slingah is offline   Reply With Quote
Old 06-23-2009, 09:13 PM   #8
"Member"
 
Join Date: Feb 2008
Location: New England
Posts: 10,719
Rewards Points: 2,000
Thanks: 5,401
Thanked 5,706 Times in 3,060 Posts
View NEPS.US's Photo Album My Photos
Default

I dont think overhead and blah, blah, blah come into play here. Foileffects would be great help to you here. This type of work is for a craftmansman-artist and you need to charge accordingly.
NEPS.US is offline   Reply With Quote
Old 06-23-2009, 09:14 PM   #9
Senior Member
 
vermontpainter's Avatar
 
Join Date: Dec 2007
Posts: 14,407
Rewards Points: 2,000
Thanks: 3,091
Thanked 5,929 Times in 3,434 Posts
View vermontpainter's Photo Album My Photos
Default

Charge twice what you charge in your shop. That should cover it.



__________________
Scott


To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.
vermontpainter is offline   Reply With Quote
Old 06-24-2009, 12:21 AM   #10
Member
 
Join Date: Oct 2008
Posts: 377
Rewards Points: 252
Thanks: 12
Thanked 60 Times in 30 Posts
View tedrin's Photo Album My Photos
Default

Just estimate how long it will take you to do the job..Be generous!...If you want to make $45.00/HR ....fine...Just multiply it by the hours you think it will take to finish..Then add the cost of the paint,materials and travelling expenses...It's better to overestimate.
tedrin is offline   Reply With Quote
Old 06-24-2009, 08:00 AM   #11
wje
Senior Member
 
wje's Avatar
 
Join Date: Apr 2009
Location: Ontario
Posts: 2,588
Rewards Points: 1,048
Thanks: 2,699
Thanked 2,735 Times in 1,228 Posts
View wje's Photo Album My Photos
Default

Remember to add in the variables here... if you are used to doing work in your shop there is no distractions, you can make your schedule... if you are in a new house I am sure there will be days where there are electrical and plumbing setbacks, so those are days lost, there will be other installs that will be in the way, dust which could tarnish your fine finishes.. .all these thing can end up costing you. explain to the builder that you cannot compete with a basic prime adn 2 coats on the trim, especially if it is installed already as now you are crawling around on your knees, and up and down ladders for casings and door jambs.... too bad you didn't know this ahead of time eh? Woulda been a nice one for you to bang off before they installed it all..
__________________

To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.
wje is offline   Reply With Quote
Old 06-24-2009, 08:51 AM   #12
Right!
 
LOSTinDETAILS's Avatar
 
Join Date: Jun 2009
Location: Athens, GA
Posts: 873
Rewards Points: 500
Thanks: 115
Thanked 184 Times in 142 Posts
View LOSTinDETAILS's Photo Album My Photos
Default

I feel 45 to 65 hour is reasonable for the work you will be performing if you have the standard operating overhead. If not adjust accordingly. You should have a feel for your method an time to apply finish so you can add that up along with a little for unforseens. Dont undercut yourself and dont blow up the price but do be fair in your estimate. Good luck and show us some pics. when you get it done.
__________________
Jason
"If you want to go back to a time where we were just a bunch of Serfs under the control of an all powerful king - go ahead and vote republican. And not only will we be dirt poor - we'll be paying these kings rent to farm the land." -Delusional TURD
To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.
LOSTinDETAILS is offline   Reply With Quote
Old 06-25-2009, 02:47 PM   #13
 
Join Date: Jun 2009
Posts: 5
Rewards Points: 10
Thanks: 0
Thanked 0 Times in 0 Posts
View cltaylor3174's Photo Album My Photos
Default

Thanks everyone for your help! I'll be sure to post pics when I'm done.
Caren
cltaylor3174 is offline   Reply With Quote
Old 06-25-2009, 04:48 PM   #14
Senior Member
 
aaron61's Avatar
 
Join Date: Apr 2007
Location: clearwater,fl
Posts: 6,326
Rewards Points: 2,030
Thanks: 3,034
Thanked 4,211 Times in 2,057 Posts
View aaron61's Photo Album My Photos
Default

You better contact Foileffects
__________________

To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.

To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.

To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.

To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.
aaron61 is offline   Reply With Quote
Reply

Tags
None

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Do you ask for the job at the estimate?? Dave Mac Business, Marketing, and Sales 53 12-16-2009 10:02 AM
Is this estimate too high or low? asaljr Business, Marketing, and Sales 9 03-10-2009 05:19 PM
I need help with an estimate ProWallGuy Business, Marketing, and Sales 22 03-03-2009 07:27 PM
Commercial estimate Melmar General Painting Discussion 12 02-16-2009 09:49 AM
Estimate Help Tashler General Painting Discussion 7 02-18-2008 06:56 PM


All times are GMT -4. The time now is 07:22 AM.


Powered by vBulletin® Version 3.8.8
Copyright ©2000 - 2020, vBulletin Solutions, Inc.
Content Relevant URLs by vBSEO 3.6.1
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2020 DragonByte Technologies Ltd.
User Alert System provided by Advanced User Tagging (Pro) - vBulletin Mods & Addons Copyright © 2020 DragonByte Technologies Ltd.
Our Pro Sites Network
ContractorTalk.com | DrywallTalk.com | ElectricianTalk.com | HVACSite.com | PlumbingZone.com | RoofingTalk.com