How do you handle rate/vs days on job? - Page 2 - Paint Talk - Professional Painting Contractors Forum
CLICK HERE AND JOIN OUR COMMUNITY TODAY, IT'S FREE!
Go Back   Paint Talk - Professional Painting Contractors Forum > Painting Forum > General Painting Discussion

Reply
 
Thread Tools Display Modes
Old 02-10-2010, 09:11 PM   #21
painting contractor
 
Join Date: Jan 2010
Location: columbia county n.y
Posts: 7
Rewards Points: 10
Thanks: 2
Thanked 1 Time in 1 Post
View b.c.p's Photo Album My Photos
Default

1.5=2...What I do is now i have that time open i'll load the truck for tommorrow,work on gettin those bid's out and any other loose ends that are always there...
b.c.p is offline   Reply With Quote
The Following User Says Thank You to b.c.p For This Useful Post:
aaron61 (02-10-2010)

Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. PaintTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Sponsored Links
Advertisement
 
Old 02-10-2010, 09:34 PM   #22
Senior Member
 
vermontpainter's Avatar
 
Join Date: Dec 2007
Posts: 14,407
Rewards Points: 2,000
Thanks: 3,091
Thanked 5,929 Times in 3,434 Posts
View vermontpainter's Photo Album My Photos
Default

Among the trades, painting might be considered the land of opportunity. There are very few professions where you can charge $50-70/hr (theoretically) to learn how to do something.



__________________
Scott


To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.
vermontpainter is offline   Reply With Quote
The Following 4 Users Say Thank You to vermontpainter For This Useful Post:
aaron61 (02-10-2010), NEPS.US (02-10-2010), Rcon (02-10-2010), salestrainer (02-18-2010)
Reply

Tags
None

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
How do you handle growth with out going crazy? DeanV Business, Marketing, and Sales 46 03-11-2011 09:03 AM
How do you handle these type people? APS, INC. General Painting Discussion 68 12-06-2010 10:22 PM
How do you handle cold temperature? salestrainer General Painting Discussion 15 12-27-2009 06:02 AM
How do you guy's handle emails like this? johnpaint General Painting Discussion 22 03-04-2009 05:24 PM
How would you handle this estimate? plainpainter General Painting Discussion 15 02-13-2009 05:55 PM


All times are GMT -4. The time now is 06:56 AM.


Powered by vBulletin® Version 3.8.8
Copyright ©2000 - 2019, vBulletin Solutions, Inc.
Content Relevant URLs by vBSEO 3.6.1
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.
User Alert System provided by Advanced User Tagging (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.
Our Pro Sites Network
ContractorTalk.com | DrywallTalk.com | ElectricianTalk.com | HVACSite.com | PlumbingZone.com | RoofingTalk.com