Default Directing painting contractors

How can I deliver an order to my painting contractor that makes the outcome I want very clear? I often find that after completing a job I discover that rotted/broken trim is painted over, difficult to reach areas are not scraped, just painted over and loose wiring on the building is sprayed over leaving a stripe of the old paint visible when the wind blows the wires around. There is always a stripe of old paint around the door edges because they are painted while closed. Below is an example of the scope of work that is given to me by my painting contractors meaning that they consider their work complete when these items are done. Does anyone have something that is better with more detail that covers the types of issues I just mentioned?

Paint Prep
- Power wash all surfaces to be painted at 3000 PSI and with Tri-Sodium Phosphate sanitizer
and degreaser
- Scrape and sand any loose paint
- Prime all bare or new wood with oil based primer
- Remove any loose or damaged caulk on painted areas and apply new caulking
- Use caulk rope if required in cracks greater than 3/8
- If cracks are greater than 3/4, owner will be notified
- Caulk all cracks with 35 year rated caulk
Exterior Painting of Buildings (139 Units/10 Buildings, Office & Mail Center)
- Apply (1) finish coat of 100% acrylic paint to cover body and trim to match existing color
scheme as close as possible
- Paint application will consist of spray, roll and brush
- Entry doors will be painted in closed position with industrial enamel
- Cedar railing to be stained in a semitransparent stain
AAAron is offline  

Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. PaintTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Sponsored Links
Advertisement
 
Old 04-21-2015, 03:35 PM   #2
RH
Moderator
 
RH's Avatar
 
Join Date: Sep 2010
Location: Oregon
Posts: 18,575
Rewards Points: 5,576
Thanks: 11,617
Thanked 15,399 Times in 8,076 Posts
View RH's Photo Album My Photos
Default

Quote:
Originally Posted by AAAron View Post
How can I deliver an order to my painting contractor that makes the outcome I want very clear? I often find that after completing a job I discover that rotted/broken trim is painted over, difficult to reach areas are not scraped, just painted over and loose wiring on the building is sprayed over leaving a stripe of the old paint visible when the wind blows the wires around. There is always a stripe of old paint around the door edges because they are painted while closed. Below is an example of the scope of work that is given to me by my painting contractors meaning that they consider their work complete when these items are done. Does anyone have something that is better with more detail that covers the types of issues I just mentioned?

Paint Prep
- Power wash all surfaces to be painted at 3000 PSI and with Tri-Sodium Phosphate sanitizer
and degreaser
- Scrape and sand any loose paint
- Prime all bare or new wood with oil based primer
- Remove any loose or damaged caulk on painted areas and apply new caulking
- Use caulk rope if required in cracks greater than 3/8
- If cracks are greater than 3/4, owner will be notified
- Caulk all cracks with 35 year rated caulk
Exterior Painting of Buildings (139 Units/10 Buildings, Office & Mail Center)
- Apply (1) finish coat of 100% acrylic paint to cover body and trim to match existing color
scheme as close as possible
- Paint application will consist of spray, roll and brush
- Entry doors will be painted in closed position with industrial enamel
- Cedar railing to be stained in a semitransparent stain
If you have a "contractor" who is doing/allowing the kind of stuff you mentioned to be done then you have more than a communication issue. You need to get a different guy.

Any reputable professional will not pull that kind of crap. Ask around (suppliers are a good place to begin) for the name(s) of someone with a reputation for doing quality work and being honest. It may take awhile to land the right outfit but it will be worth it (and when you do, treat them right).
__________________
"Outside of a dog, a book is a man's best friend. Inside of a dog it's too dark to read."

Groucho Marx
RH is offline  
The Following 2 Users Say Thank You to RH For This Useful Post:
Delta Painting (04-21-2015), SemiproJohn (04-21-2015)
Old 04-21-2015, 04:14 PM   #3
Senior Member
 
Jmayspaint's Avatar
 
Join Date: Mar 2013
Location: East TN
Posts: 4,253
Rewards Points: 14
Thanks: 1,875
Thanked 3,731 Times in 1,918 Posts
View Jmayspaint's Photo Album My Photos
Default

I'm curious what the structure for this work is? Are you taking multiple bids for it, or taking bids at all?
Just wondering because I know some of these type jobs are presented to contractors at a 'take it or leave it' flat rate.

Don't mean to be rude, just trying to clarify your question. Kinda sounds like a flat rate or low bidder situation. If that's not the case, the answer is simple, hire better contractors.
Jmayspaint is offline  
The Following User Says Thank You to Jmayspaint For This Useful Post:
Delta Painting (04-21-2015)
Sponsored Links
Advertisement
 
Old 04-21-2015, 05:25 PM   #4
Senior Member
 
Join Date: May 2013
Location: Evansville, Indiana
Posts: 1,589
Rewards Points: 42
Thanks: 34
Thanked 1,066 Times in 595 Posts
View driftweed's Photo Album My Photos
Default

Exactly. Are these rentals or high end condos or new construction? Each has different quality levels.

At the end of the day, if the scope of work hasn't been completed...DON'T PAY!!

Are you finding the scope of work inadequate? If you agreed to a scope, & they do it, but you later think it wasn't correct: too late, pay up.

Today we are doing a nicotine apartment. Client said no primer. Even after repeated requests and warnings.

Don't cry to me about bleed through, buddy. I did the scope of work as requested.

You want cheap, you get cheap. But Don't think any painters going to do perfection for free....
driftweed is offline  
Old 04-21-2015, 06:24 PM   #5
Member
 
Join Date: Feb 2012
Posts: 3,745
Rewards Points: 2,042
Thanks: 1,140
Thanked 3,181 Times in 1,677 Posts
View Oden's Photo Album My Photos
Default

Quote:
Originally Posted by AAAron
How can I deliver an order to my painting contractor that makes the outcome I want very clear? I often find that after completing a job I discover that rotted/broken trim is painted over, difficult to reach areas are not scraped, just painted over and loose wiring on the building is sprayed over leaving a stripe of the old paint visible when the wind blows the wires around. There is always a stripe of old paint around the door edges because they are painted while closed. Below is an example of the scope of work that is given to me by my painting contractors meaning that they consider their work complete when these items are done. Does anyone have something that is better with more detail that covers the types of issues I just mentioned? Paint Prep - Power wash all surfaces to be painted at 3000 PSI and with Tri-Sodium Phosphate sanitizer and degreaser - Scrape and sand any loose paint - Prime all bare or new wood with oil based primer - Remove any loose or damaged caulk on painted areas and apply new caulking - Use caulk rope if required in cracks greater than 3/8” - If cracks are greater than 3/4”, owner will be notified - Caulk all cracks with 35 year rated caulk Exterior Painting of Buildings (139 Units/10 Buildings, Office & Mail Center) - Apply (1) finish coat of 100% acrylic paint to cover body and trim to match existing color scheme as close as possible - Paint application will consist of spray, roll and brush - Entry doors will be painted in closed position with industrial enamel - Cedar railing to be stained in a semitransparent stain
They all cheat. But this scope is pretty simple. Not much to steal.
It's all one coat- can't steal any coats
You can check the material. Oil primer, 35 year caulk.....whatever you call out specifically. You can assign someone and watch them work. Real time. Same hours. If ur that worried about it.
But really. The scope on this particular job. There is very little cheating to be had. Punch out when a building is complete. And make em fix what isn't right. And if u punch out the first building when the next one is being done- nitpick a bit- they'll get the gist. What ur gonna flag,
Oden is offline  
Old 04-21-2015, 06:43 PM   #6
Save 2nd base!

 
ProWallGuy's Avatar
 
Join Date: Apr 2007
Location: St. Louis MO
Posts: 6,427
Rewards Points: 14,610
Thanks: 3,428
Thanked 4,374 Times in 1,909 Posts
View ProWallGuy's Photo Album My Photos
Default

Thanks for posting on PaintTalk.com. The Moderators of this forum would prefer if you post Do It Yourself related topics on our sister site www.DIYChatroom.com

PaintTalk.com is designed for professional painting contractors and the related fields to discuss issues and topics pertaining to the painting industries. Many of our professional contractors are also members at DIYChatroom.com and are looking forward to assist you with your needs.

Please take a moment to post your question at www.DIYChatroom.com If your not already a member of DIYChatroom.com you can sign up for a free account by going to http://www.diychatroom.com/register.php

We apologize for any inconvenience that this may have caused. This thread has been closed.
__________________

To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.


To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.




ProWallGuy is offline  
Closed Thread

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Painting Contractors broke??? spraytech General Painting Discussion 70 10-30-2014 12:43 AM
Hello fellow painting contractors! EcoDec New Member Introductions 7 08-26-2011 01:42 PM
Trump Painting Contractors trumpcoat New Member Introductions 7 12-17-2010 12:37 AM
Largest Painting Contractors aaron61 General Painting Discussion 19 11-04-2009 04:42 PM
Dallas Painting Contractors dallas painting New Member Introductions 0 01-21-2009 03:50 PM


All times are GMT -4. The time now is 05:25 AM.


Powered by vBulletin® Version 3.8.8
Copyright ©2000 - 2019, vBulletin Solutions, Inc.
Content Relevant URLs by vBSEO 3.6.1
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.
User Alert System provided by Advanced User Tagging (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.
Our Pro Sites Network
ContractorTalk.com | DrywallTalk.com | ElectricianTalk.com | HVACSite.com | PlumbingZone.com | RoofingTalk.com