Professional Painting Contractors Forum banner
1 - 3 of 7 Posts

· Registered
Joined
·
277 Posts
Discussion Starter · #1 ·
Good morning. I am bidding one side of a commercial storage. The south side, it is 975 * 24, 23,400 sq ft. It is tilt up concrete. Pressure washing the loose paint. spot prime and one coat. I don't do tons of commercial work. I was hoping you could give me some insight of how much square footage i could get done in one day with 8:17 or 12:17 using a lift. or if I should just figure using ladders. Ive done smaller commercial repaints, mile long fences, but this is different. :blink:
 

· Registered
Joined
·
277 Posts
Discussion Starter · #5 ·
Yes it's a tilt up, my SW rep happens to sell to a few commercial guys. He said rent a scissor lift and spray it in one day. ( which means two days for me....) It's gonna peel a lot. And the substrate is chalky, I'm gonna put Loxon conditioner in the bid along with A100.
 
1 - 3 of 7 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top