Professional Painting Contractors Forum banner
1 - 1 of 1 Posts

· Flog a Mocker
Joined
·
1,493 Posts
I just lost a job with 6 over 9's. I think I figured 1-1.5 hrs over my normal rate. You just never know until you get into them.


The glazing in a tube was garbage to me. I can do a lot with a knife and the tube seemed to be thin requiring 2 coats and didn't have the body to shape comfortably. The ones I did with the tube I had to clean up after they were dried.
 
1 - 1 of 1 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top