With high temps in the upper 30's and low 40's, We are still doing exterior work using SW Duration. Any other painters still doing exterior work in November?
 

· FT painter/FT dad
Joined
·
1,254 Posts
Finished my last exterior today. Ahh...no more carhart jacket while working :thumbsup:

...the guys from the south or west will probably continue to do them all year...lucky bas**rds
 

· FT painter/FT dad
Joined
·
1,254 Posts
what's up Joe...Chicago doesn't sound like Vegas to me :whistling2:

did you move or just increase your service area?...lol
 

· Rock On
Joined
·
2,451 Posts
... We are still doing exterior work using SW Duration. Any other painters still doing exterior work in November?
Not this year
Did last year though...Duration and Manor Hall
IIRC there was some little stuff even after Turkey Day...but it was really mild last year ('till feb then it went super cold for a month)
 

· FT painter/FT dad
Joined
·
1,254 Posts
...hey whatever keeps bread on the table

I'm assuming you're driving back and forth, I couldn't see the airlines letting you on with half the tools us painters use
 

· Registered
Joined
·
59 Posts
remember cure time my noreast friends, low temp 30 degree paint, paint that last clapboard at 5:00 at 35* temp drops to 25* 3 hours later during cure time, voids warantee, no store will back you up, home owner wants house stripped, ahhhhhhhhhhhh But if its all you got for work i would probably say... "%&*#@ it"... too.
 

· ....
Joined
·
4,698 Posts
Discussion Starter · #16 ·
Regal,i hear what you are saying brother. It's not all the work we have, we had soooo many towards the end of the season we just keep going. We have many lined up for spring with more spring bids in the works. We will come to a head here soon. High temps been in the mid forty to mid fifties this week and upper 40's next week. Now thats some exterior painting weather.
 

· Registered
Joined
·
558 Posts
remember cure time my noreast friends, low temp 30 degree paint, paint that last clapboard at 5:00 at 35* temp drops to 25* 3 hours later during cure time, voids warantee, no store will back you up, home owner wants house stripped, ahhhhhhhhhhhh But if its all you got for work i would probably say... "%&*#@ it"... too.