Joined
·
6,326 Posts
Well here's one that will last awhile!(2-3 months) Two 5 story apartment buildings.We are painting all the hallways,baseboards,doors & door frames. Literally miles.Then we are painting all the offices,lounge,work out areas,rec areas & common bathrooms.
We will have completed 2 floors in two weeks.Colors alternate about every 100 feet with a metalic faux expressions at the end of each hall.
There are six hallways, the link of the ones in the picture, per floor. 680 doors:thumbsup:
We will have completed 2 floors in two weeks.Colors alternate about every 100 feet with a metalic faux expressions at the end of each hall.
There are six hallways, the link of the ones in the picture, per floor. 680 doors:thumbsup:
Attachments
-
103.5 KB Views: 227
-
116 KB Views: 215
-
111.2 KB Views: 205
-
100.5 KB Views: 215
-
106.9 KB Views: 196