I am hoping to leave them on jobsites for the exterior crew so I can drift between interior work and exterior work in the summer as my schedule dictates, not the needs of the crew. That way hopefully I can buy 100 gallons for a job up front, or at least 50 and have all the stuff right there to cut down on my trips to the paint store and needing to be there at a specific time to get the job running.